Qinghai High-precision Aluminum Strip Project goes smoothly


Zebian writer: Lina Liu Jianmin WASHINGTON solution as a low-cost variety of optimal allocation of economic factors, a bold attempt to foster industrial clusters, with a total investment of 2.86 billion yuan Qinghai Province "Eleventh Five-Year Plan" key project --- industrial peace annual Qinghai 200,000 tons of high-precision aluminum strip project construction progressed smoothly. At present, we have completed the bidding and purchasing of imported equipment such as cold rolling, hot rolling, and finishing, bidding and procurement of public and auxiliary equipment, civil engineering construction of some workshops and supporting facilities, construction of railway lines and 110KV lines, and theoretical training for 100 technical backbones. Successfully entered the 2009 construction period. Qinghai Ping’an 200,000-ton high-precision aluminum strip project is located in Dongcun, Pingan Town, Pingan County, Qinghai Province. The Qinghai Province Investment Group Co., Ltd. coal-electricity-aluminum industry is 1.8 million tons of raw coal/year, 5.2 billion kWh of electricity/year, 350,000 The industrial chain extension project of tons of electrolytic aluminum/year, 200,000 tons of cast-rolled coils, and aluminum ingot/year is an important measure for the company to actively implement the resource conversion strategy, develop a recycling economy, and enlarge and strengthen the pillar industries. The project has a designed capacity of 200,000 tons, and adopts advanced equipment and processes at home and abroad. The production lines are hot continuous rolling, cold rough rolling and cold finishing rolling mills. The main products are high-precision and wide-width aluminum foil blanks, plate bases, and high-grade decorative curtain wall boards that are imported instead of imported products. . The project is based on the province's natural resources such as energy, mineral resources, and other natural resources, is the leading product extended forward and backward, the formation of existing raw material base, processing links, as well as the end product is completed product chain. As of the end of 2008, the project has completed a total investment of 1.064 billion yuan. This year is an extremely critical and important year for the construction of the project. It is estimated that an investment of 600 million yuan will be completed in the whole year. Faced with the many adverse effects brought by the international financial crisis, the person in charge of the project stated that it will further strengthen employee skills training, actively seek technical support, prepare talent reserves for installation and commissioning and follow-up production and operation, and scientifically and rationally strengthen on-site organization and management. To ensure effective control of project quality, safety, duration, and budget estimates; to make good preparations for the acceptance of imported equipment, storage, etc., and to ensure that the cold rolling production line is put into operation at the end of the year. aims. (Xie Lina Liu Jianmin)