Renovation Owner Must-See Blank Room Renovation Steps

For those who haven't experienced the renovation of the house, if they want to get all of their own decoration materials, design the renderings, and then carry out the construction, such a large project cannot be imagined. The following small series introduces the decoration steps for the rough house .

Blank room renovation steps

1, for the overall measurement of the rough room and the main demolition

Determine the size of the area and the size of the wall in the decoration process. For tiled areas, wall paints, etc., you need to prepare in advance, and then the main demolition reform, including the demolition of the wall, shovel wall, change steel window and so on. The rubbish removed must be cleared in time to facilitate future construction.

2. Start hydropower reform

Before the hydropower reform, we must determine the location of the lamps and sockets; when we slot the hydropower, the strong electricity is tied with the weak electricity, and the lights on the top must be clearly bound, and there are others. For the air conditioning hole and the power is best placed on the wall of the bed to avoid blowing air directly after the person.

3, tiling began

When preparing for tiling, you must choose a floor drain, and you must select a floor drain. You must select a dedicated floor drain so that you can effectively prevent odors. After you finish waterproofing and brushing, you can prepare a tile.

4, install the floor

Level the floor before installing the floor so that the floor is level and flat.

5, the whole room as a whole installation

The overall installation includes: lamps, sanitary ware, door locks and cabinets, etc. These can be carried out at the same time as the paint. These installations are not good and will affect the appearance. Therefore, great attention must be paid to the installation.

Blank room inspection room matters needing attention

1, the balcony, rain cover and other exterior parts must be carefully checked.

2. Electrical equipment and public equipment need to be inspected.

3, all kinds of pipeline test pressure, water, heating inspection.

4. Various types of doors can be checked with prefabricated floor or cast-in-place ceilings.

5, the room with waterproof requirements must be strictly in accordance with the waterproof layer, protective layer requirements to plan, acceptance can be carried out two water storage test, so that no leakage.

6, water acceptance including kitchen, bathroom. Bathrooms include floor drains, toilet water pipes, water pipes under the toilets, and sewage pipes in wash basins. Check if there are any problems during acceptance. Problems can be changed. The reform plan must listen to the opinions of experts.

Editor's summary: About the rough room renovation steps introduced here and hope to be helpful to everyone. Want to learn more related knowledge can focus on this site information.

Decoration Steps Decoration Steps & Budgets Blank Room Decoration Steps

China Tricalcium Phosphate Powder,Tricalcium Phosphate supplier & manufacturer, offer low price, high quality Tricalcium Phosphate Fertilizer, Tcp Fertilizer , etc.TCP is 18%,17% purity .it is white or grey colors .and we have the big sell to Oceania ,Asia,South America .ANIMAL FEED: Tricalcium Phosphate(TCP) is derived from phosphate rock,It is a source of highly available phosphorus and calcium(Ca) that will help meet animal and poultry .It can be used as feed additives to raise the anti-disease ability and shorten the fatten time. Meanwhile,TCP is the preparation of feed raw materials to supplement animal right calcium needs. Coarse products more applicable to the preparation hens, ducks feed, concentrate feed and premix.

Tricalcium Phosphate (TCP) Fertilizer

Tricalcium Phosphate Powder,Tricalcium Phosphate,Tricalcium Phosphate Fertilizer,Tcp Fertilizer

MIDI FEED BIOTECH LIMITED , https://www.chinabromine.com