What are the steps to decorate a house? How to purify the indoor air

The decoration of new houses is a headache for every family. Some people will choose to package all of them to the decoration company. Some people will choose the way of half-packing and cleaning. Regardless of the way they choose to decorate, we can roughly understand the steps to decorate the house. What? After the new house is renovated, how can we purify the indoor air better? Then Xiaobian will give you a brief introduction of the steps to decorate the house and how to purify the contents of the indoor air.

What are the steps to decorate the house ?

1, pre-design

When a new house is renovated, we usually design and decorate the house, and we need to conduct a detailed measurement of the new house, especially the area involved in the renovation process, such as the size of the wall.

2. Main body dismantling and reform

If we are dissatisfied with the structure of the house, we will generally carry out major demolition and reforms, such as wall removal and wall cladding. When the wall surface is demolished, the load-bearing wall cannot be dismantled, nor can the steel structure of the wall be destroyed.

3, hydropower reform

Before the hydropower reform, we must first determine where to install faucets, sockets, etc., cabinets also need to make the first measurement, set a good position in the kitchen. The installation of the waterway should be as far as possible without going down. The hot and cold water must be colored pipes. The spacing between hot and cold water pipes is 15cm, and the ground is about 1 to 1.2 meters.

When the circuit is in the wiring, minimize the crossover on the ground. Do not walk the transverse groove on the load-bearing wall. The distance between strong and weak electricity should be at least 30 cm. When installing the socket, it should meet the requirements for left-to-right fire grounding.

4, waterproof engineering

After the completion of the waterway reconstruction, we can do the waterproofing of the bathroom. The waterproof coating for the bathroom should be painted twice and the closed water test for 24 hours.

5. Construction process

The construction process mainly includes material acceptance, construction process, and construction quality. Acceptance of decoration materials such as tiles, paving tiles, wall tiles, etc. After the foundation works such as the wall surface are completed, wallpaper paving and hardware appliances are installed.

6, various installation

We can install the previously purchased ceiling cabinets, kitchen utensils, sanitary ware, doors and windows, etc. in turn.

How to purify indoor air

1, house drying

After the new house is renovated, there will be air pollution such as formaldehyde. We will generally dry the house and during the drying of the house, we must maintain the air circulation of the house to avoid exposure and rain. Houses must stay dry for a minimum of one month before they can stay.

2, the plant to formaldehyde

We can raise some potted plants such as spider plants in our new house. Chlorophytum is known as a green purifier for indoor air and has the function of removing formaldehyde and purifying the air.

3, formaldehyde scavenger, air cleaner

Formaldehyde scavenger, air cleaners and other products on the market can purify the air. We can choose according to our own needs.

4, place some activated carbon

The adsorption of activated carbon is relatively strong, and the placement of activated carbon is also a way of purifying the air. Some stores, such as supermarkets, sell activated carbon.

Xiao Bian summary: The above is the small series of the steps involved in the renovation of the house , how to purify the entire contents of the indoor air, and hope that after reading this article, to provide reference and help everyone.

7 Wire PC Strand

7 Wire Strand,7 Wire PC Strand,Low Relaxation Strand,Low Relaxation 7 Wire PC Strand

Shandong Xindadi Holding Group Co., Ltd , https://www.xindadipcwire.com