The decoration has entered the busy season. For the owners, the decoration process is tangled and exhausting. In order to prevent certain irresponsible decoration teams from cutting corners and shoddy work in the construction process, the owners must keep an eye on the acceptance process. Each stage of the project is completed, and the subsequent steps are carried out after acceptance, so as to ensure the final decoration quality.


Del flooring

Material: Signature of material details when signing the contract

When signing a contract with a customer, the formal decoration company will sign a material declaration sheet detailing the brands, specifications and quality grades of the required materials. The parties shall check the materials according to the material specification. In general, the materials to be checked before construction include pipes, wires, planks, putty, cement, sand, etc. As the project advances, ceramic tile, paint, and paint will be accepted later.

[Acceptance notice]

First, the time for acceptance of the agreed materials

After the material is purchased, the purchaser must notify the other party to the contract to prepare for the acceptance of the material, preferably when the material enters the site. The agreed acceptance time is very necessary to avoid material entry, the other party does not have time to accept the material, affecting the construction progress.

Acceptance must be present

The home improvement contract stipulates that after acceptance of the materials, the inspector must sign on the site to avoid unnecessary troubles or disputes later. The inspector shall carry out the necessary inspections for each material agreement stipulated in the contract, such as brands, specifications and quantities.

Acceptance person should sign on acceptance form

If the inspection result material is qualified, the acceptance person should sign the material acceptance form. If the owner finds that the entry materials are inconsistent with the contractual requirements, he may refuse to sign the material acceptance checklist until he negotiates with the home improvement company for settlement.

II. Hidden Project: Acceptance before Closed

In the early stage of the project, pre-acceptance should be carried out for completed concealed projects such as hydropower projects. Because these projects will be obscured when they are completed, they must be checked before they are closed to prevent concealment from becoming a hidden problem.

[Acceptance notice]

Circuit: Note whether the wire is up to standard

Since the switch panel has not yet been installed at this time, when the circuit is accepted, the consumer pays attention to whether the used wire is the designated brand and whether the wire is up to the standard.

The wires used should meet the maximum output power of the electrical equipment. In general, the average household lighting requires a wire with a cross-sectional area of ​​2.5 mm2, and the air conditioners and other household appliances use a wire with a cross-sectional area of ​​4 mm2.

Dark lines buried in the wall must be installed outside the casing, the casing material is better than PVC material or galvanized iron pipe.

Waterway: Conduct pressure test

If the water pipe is not sealed properly, the water pipe bursts. Therefore, after the completion of the waterway reconstruction, the water pressure test must be performed. In addition, it depends on whether the installation of the faucet, accessories, etc. is square, solid, complete, without damage, whether the water is smooth, whether the floor drain is smooth, etc., should be carefully checked. The easiest way to check if a floor drain is open is to pour a bucket of water on the floor and see if the water flows smoothly.

Waterproof: 24 hours closed water test

Closed water test is a common method for testing waterproofing in home improvement. In the closed water test, the consumer needs to determine the test time with the foreman first, then close the drain hole of the room and put the water into the room (the water level is not lower than 3cm ) After 24 hours, check or ask if there is leakage in the downstairs household.

Check the bathroom wall waterproof when you can first check the wall paint is uniform, there is no leakage brush phenomenon, in particular, to check if the yin and yang angle leak brush, to avoid yin and yang due to leaking brush waterproof coating caused by dampness and mildew. The waterproof height of the shower wall is usually about 1.8m, and the wall waterproof of other areas should be higher than 1.5m.

Construction Acceptance Entrance Decoration Children's Room Decoration Paint Decoration Home Decoration Company Room Floor Tile Kitchen Wall Tile Door Kitchen Cabinet Door Bathroom Tile Bathroom Door Bathroom Wall Tile Bathroom Wash Basin Toilet Design Toilet Waterproof Floor Tile Kitchen Tile Balcony Tile Tile Tile Specification

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Shower Panel

Freestanding Bathtub Shower Panel Co., Ltd. , http://www.chbathtub.com