Netizen home installation floor record

The installation of the floor, we all know more or less. The installation quality of the floor has a great influence on the overall effect and service life of the wooden floor after laying. The following is an example of a floor installation by a netizen. You may wish to take a closer look at the installation details!

Gadgets needed to install the baseboard

Come and see the tools for installing the master. The master is very hard to come by bus from a distant place.

First of all, the installation master of my home was introduced. There were two master chefs. The two of them were brothers and will complete the floor installation work in my house. This is the master's cutting door of the balcony door of my house. The door cover is too long, and it directly cuts the floor. It needs to cut off part to facilitate the floor installation.

The master lays a dampproof mat in a large room and the laying process is very fast.

Look at the already laid moistureproof mats. (Because of all the considerations, we decided not to pave the way)

The master lays a dampproof mat in a small room.

The master unpacks and prepares to begin laying.

A close-up of the floor.

Look at the negative factory date, the date is good and fresh, this should be produced on June 8, 2009.

E0-level environmental protection marks its identity, E0-level environmental protection.

After the masters lay the dampproof mats, they will place the floorboards on the moistureproof mats in order of their original arrangement.

The master has begun to open, the first board is very important, a good beginning determines the success or failure.

When the master is laying, the steps are generally to align the locks first, then use the hand to make a card, and then use a small hammer to knock three times. This successfully installs a piece. (This is what I observed. I don't know what to say. It seems to be quite simple. However, the mystery is really not something that outsiders can master. I believe this is also the process that the masters have accumulated over the course of time. Accumulated.)

The installation is also very knowledgeable, and generally it is not the installation from the beginning to the end (the expression may be unclear). It is just like building blocks like engineering.

Take a look at the situation when the floor is lined up.

In the later installation process, it is not difficult to find that because there are so many floors that need to be cut, if you cut outside the room, you need to run back and forth. General masters measure 3-4 blocks at once and cut them once.

Look at this is a cut finished product.

In a blink of an eye, the floor of the master bedroom has been laid over halfway.

When the master who lays the second bedroom has been fully laid, it begins to lay a moistureproof mat in the living room.

After laying the floor is still lined up.

This is the view from the restaurant to the living room.

Vaguely able to see in the plexus, the figure of the master is still so conspicuous.

This is a tool. It is an essential flaw when installing floors. Especially when installing a wall corner or a floor against a wall, it is necessary to use this tool to complete the “hit” work.

I saw the figure of this gadget, and it had a more nails on it. This is the clip that must be used to install the kick.

A large bag of clips is more than enough for my family.

See no, these small clips have all been on the wall, as long as the baseboard directly installed on these clips on the OK.

Already installed baseboard, with the kicking of the match, more and more feel decent.

The inside and outside corners necessary for installing the baseboard. It is because of their existence that the foot line is more beautiful when installed. (Just remember that when my laminate flooring was installed N years ago, there was no such thing. The times are improving. I don't know if there will be new products when I am in renovation.)

Let's take a look at the special baseboard for the Rhineland. The thickness is good.

The two brothers joined hands to complete the final closing.

This is the installation of the living room foot line.

The master prepares the batten at the door.

This is taken from the kitchen to the living room.

Such a large area of ​​laying feels very good.

This is a shot from the balcony toward the kitchen.

A corner of the living room.

The master bedroom shot from the doorway.

From the master bedroom to the second bedroom.

Second bedroom landscape.

Take a look at the bead at the door of my home (the quality is unusual, but because my family's door is not installed, the bead is only temporarily placed on the floor, so the door is installed and is officially installed).

This is the buckle at the junction with the bathroom. Because the glass is glued, press it with a heavy object.

Take a look at what this is, use waste, pick something bigger and better, and prepare for later insulation boards. (For example, a very hot pot just under the stove, placed on top, absolutely resistant to hot).

Wooden floor standard installation

One. Before installation:

On-site measurement area, check the level of the ground, the strength of the grass-roots, the ground water content.

II. Pre-paving process:

1. Clean the floor, do not allow sand or other hard objects on the ground, to prevent the floor mats from passing through the back of the damp to affect the use of the floor.

2. The floor mats are required to be thicker than 2.5mm. The floor mats and the floor mats must not overlap, and they should be laid 5mm above the corners of the walls. The joints should be bonded with transparent plastic. No voids should be allowed to expose the cement surface.

3.Before installation, the doors and door pockets must be set aside to ensure the free opening of the doors after the floor is installed. During the sawing process, we must first scribing and then operating, and the cutting of door pockets and doors should be flat. Two straight three highly accurate, not to damage the rest of the door.

4. Before the installation, set the installation position of the buckle. The buckle is required to be vertical to the door. The buckle must be installed without sound.

Three. Install the floor:

1. Install the first floor from the left side of the room, place the side with the notch into the wall, add the same thickness of wood, reserve a 8-12mm expansion gap, and the gap should be neat.

2. Measure the length of the floor required for the first row of tails. Reserve 8-12mm of expansion joint and saw off the excess.

3, The floor under the saw is not less than 300mm in length as the beginning of the second row, and between the adjacent two rows of floor short joints is not less than 300mm.

4, the long side of the floor and the ground to maintain proper angle direction into the slot, gently press to lock the floor.

5, In order to make the floor straight, measure the straight line after laying each row of floor, check the flatness of the floor, in order to adjust in time.

Four. Install the baseboard:

The thickness of the baseboard should be greater than 1.5mm to ensure the use of materials that comply with national environmental standards.

1, When installing special plastic steel baseboards, it is necessary to use electric hammers to drill at the foot line wall. The height of the holes must be the same, the distance is 500mm, the wooden wedges are nailed, and the inner buckles are fixed with headless steel screws or screws. The baseboard is lightly buckled, and the same gap is reserved for all baseboard joints to ensure the overall appearance of the baseboard.

2, when installing special solid wood legs, the general use of non-nail installation, the use of environmentally-friendly high-strength glass adhesive fixed, all the skirtings should be cut at an angle of 45 degrees to connect, to ensure that the joints are beautiful;
After installing the rear line, be sure to cover the expansion joint. If the wall or the foundation is not flat, gaps are expected. It is also done by the decorative wall painter.

Five: Close strip and door strip installation

in the room. At the junction between the halls, the floor must be cut off, leaving enough space for expansion and contraction. With transitions between the shut-off bars and the battens, the buckling requirements are perpendicular to the door pockets, and sound stability is not allowed for the stable installation. Doors and floors should be spaced 3-5mm so that the doors can open and close freely.

6. After the wood floor is laid and installed, the rest materials after installation are all packed into the floor box and sealed; after the floor is clean, the main walking area is covered with a floor box or floor film for protection.

Flooring Room Glass Decorating Cement Paint Decoration Living room doors Glass doors Kitchen glass Sliding doors Overall bathroom Bathroom doors

Balcony Side Awning
1. Polyester,waterproof with PU coating and UV protection
2. Special Full Aluminum Cassette Side Awning, cassette fixing and foot cover
3. More Stronger handle with metal
4. Both using choose on hanging or fixing on the floor
5. Simply installed as long as there is the balcony or frame or wall
6. Build the middle ground of the convergence of indoor and outdoor balcony living space to creat a variety of spare time

Material Full Aluminium Cassette Side Awning 
Color By RAL color code or by customer`s request
Max. height 2000
Max. Length 3000
Mounting condition Should be installed the balcony or frame or wall
Installation way Face Fit 

Side Awning/Paravent Screen

Window Awning,Sloping Window Awning,Window Awning With Gearbox,Sun Curtain In Polyester

Hebei Charlotte Enterprise Co., Ltd. , http://www.cnscreening.com