Grouting materials use pre-construction preparation and tools

【China Aluminum Network】

Grouting materials use pre-construction preparation and tools

Preparation before construction

3.1 The tools and materials to be prepared 3.1.1 One scale with a range of 100kg, and the use of water and weigh material 3.1.2 Manual agitation: Preparation of 2 pieces of 1m x 2m mixed plate, and some 3.1.3 of planed mechanical agitation: Preparation of concrete Mixer or mortar mixer 3.1.4 Number of small buckets, water and transport grouting material 3.1.5 Several bamboo baskets, for ease of grouting materials 3.1.6 Several plastic adhesive tapes, affixed wooden formwork joints and joints, to prevent water leakage 3.1 .7 Tools such as trowel 3.1.8 Prepare the necessary number of sacks or straw curtains for maintenance after grouting 3.1.9 Prepare the necessary number of formwork materials, preferably wooden formwork. If pumping is used for grouting, due to the pressure, the connection template requires steel plate connection 3.1.10 When using the pumping method or the high funnel method for grouting, a rubber hose or plastic pipe with the necessary length and suitable pipe diameter is required for the supply Mixing water requires a certain length of water pipe and a large oil drum (for water supply)

3.2 Preparation of grouting material 3.2.1 When GM type grouting material is used on site, water can be added according to the recommended amount of water provided on the product inspection sheet accompanying the goods and can be used evenly after mixing. When anchor bolts are anchored, water consumption can be appropriately reduced on the basis of actual project conditions.

3.2.2 Mixing of GM type grouting material can use mechanical stirring or manual stirring. When using mechanical stirring, stirring can be uniform, stirring time is generally 2 ~ 3min; manual mixing, the first GM-type grouting material poured on a mixed plate, and then add 2 / 3 of the amount of water, stirring 2min and then add the rest 1/3 of the water is stirred. While stirring, you should tip over and insert the rake. To make it completely uniform and increase fluidity, generally require more than 5min.

3.2.3 The agitation site should be as close as possible to the grouting site. The distance should not be too long. No matter whether mechanical agitation or manual agitation, they must be grouped to ensure the continuity of grout.

3.2.4 The amount of each agitation should be determined by the amount used to ensure that the material is used up within 45 minutes. Unused part can not add water to stir.

3.2.5 It is forbidden to incorporate any other admixtures, admixtures and other materials in the GM type grouting material so as not to affect the use effect.

3.2.6 In winter construction, when the ambient temperature is lower than -5°C, hot water mixing grouting material should be used. The water temperature is between 50~70°C to ensure that the sizing temperature of the grouting material is greater than 5°C.

Spoke Load Cell

CZL-YB-××-L series Load Cell is spoke type structure, and is produced by alloy steel. Its bearing form is compression type. It
has various features such as low height, convenient installation and operation, strong anti-overload capacity and small power consumption, and has the capacity from 1t to 50t. It uses inside glue sealing, has excellent damp proof and anti-corrosion proof performances, and can be used in adverse environment. It is suitable for explosive danger fields, and has product explosion-proof label Exia â…¡ CT6Ga; ExiaD20T85. It can be used for producing electronic scales such as electronic Truck Scale and Hopper Scale.

Industrial Load Cells,Strain Gauge Load Cell,Low Height Analogue Load Cell,Spoke Load Cell

SHANDONG JINZHONG SCIENCE & TECHNOLOGY GROUP COMPANY LIMITED , https://www.chinagoldbell.com