Teach you to sign a rest assured renovation contract

Disputes in home improvement contracts often appear in the following areas:

I. About contract documents

A more complete home improvement contract, in addition to the project budget and design drawings, should also include construction processes, construction plans for the key construction projects, and material purchase orders for both parties.

The construction process is a magic weapon that restricts the construction party from strictly implementing the agreed process practices and preventing the cutting-off of materials. There must be a construction plan in the contract, mainly because the phenomenon of delaying the construction period of home decoration is commonplace, and it is very difficult for consumers to find problems when the contractor delays the construction period. Therefore, a more rigorous construction is required. Plans are the necessary weapons for consumers to protect themselves. Nowadays, many home improvement contracts do not attach much importance to the material purchase orders of both sides of the contract. Although some provisions have been made in the contract, most of them are superficial and are mainly reflected in the brand of the materials, the time limit of the purchase, and the methods of acceptance and acceptance. No clear provisions have been made. Therefore, some of the above-mentioned documents that are often overlooked in home decoration contracts should not be missed.

Second, on the design drawings

Many home decoration disputes are reflected in the understanding of the project. For example, for the understanding of some project modeling, because there is no more detailed drawings, there may be some gaps in understanding between designers and consumers. Some projects may have gaps in specific dimensions because of unclear drawings. Therefore, it is recommended that when you sign a contract, you should try to prepare the drawings as much as possible to avoid the need to carry out these aspects of the work after the start of work, causing unnecessary trouble.

Third, on the project budget

The project budget for home decoration is generally complete to the consumers of formal decoration companies. According to the project budget based on the current "Shanghai Family Home Decoration Project Construction Contract" related table, key projects including project items, quantities, unit prices, reference materials, etc., basically have no defects.

However, some consumers report that when the project is settled, there is often a gap between the settlement amount and its own expectations. In addition to the changes in the costs of the engineering changes during the construction process, the main reason is the hydropower reform. Originally, when a decoration company and a consumer sign a home improvement contract, some conditions on the site are not very clear at this time, so the quoted price generally indicates the unit price of hydropower reform. The total project cost does not include the cost of hydropower reform. When the project is settled, the settlement of all projects is done, and the gap is inevitable. Therefore, it is recommended that you, as far as possible, request the decoration company to give you a reference quotation of hydropower reform in the engineering quotation.

Fourth, avoid the impossible clause

Many home decoration complaints are brought about by unrealistic contract terms. Some contract terms stipulate the construction quality that cannot be achieved under the relevant engineering quotation, and some contract clauses stipulate the indoor air environment clause that is impossible under any conditions. For example, one of the owners once asked in the additional clause of the contract that after the decoration is completed, the professional monitoring agency is required to monitor the indoor environment and require indoor absolute environmental protection. But what is "absolute environmental protection"? First of all, it is unclear in terms of concepts. What's more, if a residential house has been renovated, there will be certain environmental pollution problems in different degrees. No one or any company can do “absolute environmental protection”.

Therefore, the market generally does not support this requirement when conducting contract certification. Therefore, it is recommended that you do not consider the requirements that cannot be met under the current market reality when signing a contract. Because even if this is done, the decoration company agrees to sign the contract. In the future, it will be inconvenient.

Construction Contract Home Decoration Home Decoration Company Interior Decoration Budget Form Decoration Project Budget

Other Belts

Rubber Belt,Belt Conveyor,Conveyor Roller

Perforated Metal Sheet,Belt Co., Ltd. , http://www.nslinkfence.com